Cavitt Stallman Mainline ‐ Mystery Creek and Oak Pine Lane with PRS (Retail)

This project involves the installation of approximately 200 lineal feet of new 12-inch diameter ductile iron pipeline between the end of the existing pipeline in Cavitt Stallman Road to the east of Mystery Creek Lane and the existing pipeline at the northerly end of Oak Pine Lane at the intersection with Cavitt Stallman.  Work also includes the installation of a new Pressure Reducing Station (PRS) to control pressures between the ends of the pipeline as the new pipeline will connect between two pressure zones.